Steel structure of port unloading equipment – USA project

Construction of a complete steel structure, assembly of structural groups into complete devices on the quay at the Assembly Plant in Szczecin, installation of electrical, hydraulic, central lubrication, and water systems, assistance during no-load testing of the device, loading onto a pontoon, intermediate transport to the side of the Big Lift ship.

Steel structure for port loading equipment – Project Norway

Construction of a complete steel structure, assembly of structural groups into complete devices on the quay at the Assembly Plant in Szczecin, installation of electrical, hydraulic, central lubrication and water systems, assistance during no-load testing of the device, loading onto a pontoon using the sliding method.

Steel structure for two unloading devices – RWE Power Plant Project in Eemshaven

Construction of a complete steel structure, assembly of structural groups into complete devices at the Assembly Plant in Szczecin, installation of electrical, hydraulic, central lubrication, pneumatic, and water systems, assistance during no-load testing of devices, loading onto a pontoon, transport, and unloading onto rails at the quay in Eemshaven.

Steel structure of ship loading equipment – EMO Terminal Rotterdam project

Construction of a complete steel structure, assembly of structural groups into a complete device on the quay at the Assembly Plant in Szczecin, installation of electrical and hydraulic systems and central lubrication, assistance during no-load testing of devices, loading onto a ship.

Steel structure of the Drum Reclaimer – ArcelorMittal Dunkirk Project

Construction of a complete steel structure, assembly of structural groups into a complete device on the quay at the Assembly Plant in Police, installation of electrical and hydraulic systems and central lubrication, assistance during no-load testing of devices, disassembly into shipping elements, loading onto a ship.

Steel structure for 2 stackers and 3 scrapers – Eemshaven Project

Construction of a complete steel structure, assembly of structural groups into complete devices at the Assembly Plant in Police, installation of electrical and hydraulic systems and central lubrication, assistance during no-load testing of devices, disassembly into shipping components, loading onto a ship.

Steel structure of a stacker/reclaimer with a tripper car – Canada project

Construction of a complete steel structure, protection with a full anti-corrosion system, mechanical processing, trial assembly, loading onto a ship.

Steel structure of the ship loader – Project Staudinger

 

Construction of a complete steel structure, protection with a full anti-corrosion system, mechanical processing, trial assembly, loading onto a ship.

Steel structure of the ship unloader and scraper – Walsum Project

Construction of a complete steel structure, protection with a full anti-corrosion system, mechanical processing, trial assembly, loading onto a ship.

Steel structure for stacker/reclaimer – Visonta Project

 

Construction of a complete steel structure, protection with a full anti-corrosion system, mechanical processing, trial assembly, loading onto a ship.

Steel structure for ship unloader – Project Latvia

Construction of a complete steel structure, protection with a full anti-corrosion system, mechanical processing, trial assembly, loading onto a ship.

Steel structure for two stacker/reclaimers – Immingham Project

Construction of a complete steel structure, protection with a full anti-corrosion system, mechanical processing, trial assembly, loading onto a ship

Steel structure of the Ship Unloader – Project KTG Hamburg

Construction of a complete steel structure, protection with a full anti-corrosion system, mechanical processing, trial assembly, loading onto a ship

Steel structure of the Ship Unloader – Project Fremantle Ports Australia

Construction of a complete steel structure, assembly of structural units into complete devices at the Assembly Plant in Szczecin, installation of electrical, hydraulic, central lubrication, pneumatic, and water systems, assistance during no-load testing of the device.

Steel construction of tubular cranes – Project Barge Born, Cologne, Sims Metal, Hanover, Brunsburtell, RMG Loksa, Braunschweig

Construction of a complete steel structure, protection with a full anti-corrosion system, mechanical processing, trial assembly, loading onto a ship

Steel structure of column cranes – Project Schwedt, Admiral, Brodo Split

Steel structure construction, full anti-corrosion protection system, mechanical processing, trial assembly, loading onto a ship

Steel structure of the scraper – Enel Project

Construction of a complete steel structure, protection with a full anti-corrosion system, mechanical processing, trial assembly, loading onto a ship.

Steel structure for 2 stacker/reclaimers – Project ILVA Taranto

Construction of a complete steel structure, protection with a full anti-corrosion system, mechanical processing, trial assembly, loading onto a ship

Steel structure for the container cranes – Rotterdam Project

Complete construction of a steel structure for three cranes, protection with a full anti-corrosion system, mechanical processing, loading onto a ship, participation in final assembly at the port of Rotterdam.

Steel structure of 2 Stackers,  Reclaimer RP06 – SNIM Mauritania Project

Construction of a complete steel structure, protection with a full anti-corrosion system, mechanical processing, trial assembly, loading onto a ship

Steel structure of ship loader, stackers, reclaimers, and belt conveyor system – UST LUGA Project

Construction of a complete steel structure, protection with a full anti-corrosion system, mechanical processing, trial assembly, loading onto a ship

Steel construction of the Ship Loader – Project to Norway

Comprehensive realization: manufacturing of the steel components, final assembly, installations, no-load commissioning

Steel construction of the Ship Unloader

Comprehensive realization: manufacturing of the steel components, final assembly, installations, load commissioning